The Drainage bunker is used for dewatering and soaking of products. The product is fed into the bunker and discharged from the bunker through a discharge elevator.
Construction
The product is placed into the infeed bins with a forklift truck. The elevator belt goes from the inlet to the elevator / outlet in the acceptance bin and transports the raw material out of it. The product is fed by means of a high-pressure blower in the direction of the outlet by means of nozzles located at the rear and in the rear part. In addition, a paddle outlet side is located above the elevator, which additionally conveys the product to the elevator belt and helps with the discharge.
In the acceptance bin are screwed perforated sheet metal inserts which trickle the coarse dirt / sand down towards the bottom of the bath.
For later cleaning, the tub can be opened and cleaned all round with large cleaning doors.
Specifications
Type | AB2,5/6 |
Performance |
Dimensions
Total length | ~ 5.000 mm |
Total width | ~ 2.200 mm |
Total height | |
Insertion height | ~ 2.400 mm |
Ejection height | ~ 1.200 mm |
Elevator
plastic modul tape with tappets, band width ~ 650mm |
Antriebe
SEW geared motor with frequency converter |
Material strengths and qualities
Pasteurizers for Meiko
Company Meiko has received 2 new pasteurizers from ten Brink. 1 piece with a length of 30 meters...
Read More...